Sell

Search 1,449,155 ads on Pakistan's favorite Classifieds Site

in

Water Proofing Heat Proofing in Kpk.

Haripur, Pakistan
  • Ad Id
    1150364
  • Ad Posted
    14 Jun 2014
We have the industries best waterproofing and protective coatings for all types of difficult waterproofing situations like Top roof, retaining walls, basement walls, floors swimming pools etc. Water ProofingWater proof Coating of roof is an important Task for roof repair and preservation.Many roofs through Providing and laying following roof treatment including removing the existing damage / cracked roof treatment and its disposal including thoroughly cleaning of surface applied with a suitable detergent cleaner to remove any surface contaminates such as oil, grease verdigns etc. Apply a minimum of 05 (five) coats of Electrometric waterproofing to concrete roof / walls or similar surface (5-6 sq M/ltr) with brush / roller. Thinning of mixture is not required and color should be of user choice including the cost of materials, labors, tools. Tackles' equipment, scraping, cleaning removing of dirt, making of surface smooth, transporting the stuff and as finishing etc. Specifications and as directed by the engineer and according to under mentioned properties:- 1. Color -- white2. Denisty -- 1.2 gm/c.c3. Maximum Tensile strength - 150pci (ASTMD 412)4. Elongation at break -- 690% (ASTMD 638)5. Thickness after completion 1.5mm6. Foot Traffic -- May be allowed after coating7. Accelerated weathering UV Resistant8. Solid content $ m/m -68.4 (ASTM 2369) WE USE ON THIS PALACE WATERPROOFING:1. Roof must be clean and dry , Wash roof with water. 2. A primer coat of chemical compound with admixture of cement.3. Joint creakers will be filled by chemical compound.4. After coat apply polestar fiber sheet5. Fainal coat for all roof chemical admixture of by ACR cement. HEAT PROOFING:1. Roof must be clean and dry , Wash roof with water.2. A primer coat of chemical compound.3. After coat apply polister fiber sheet4. Final coat for all roof chemical admixture. WATER TANK:1. First time Cleaning water tank and dry.2. A primer coat of chemical compound with admixture of cement.3. Joint creekers will be filled by chemical compound.5. Final coat for all water tank chemical admixture of by ACR cement. Bathrooms: 1. All points cleaning and dry to blower machine.2. we use all points of bathroom leakage chemical in cement3. all tills filling to white cement with chemicalViews: 220